Hot Melt Machine User Manual

X7Vo7

I. General Overview

A hot melt machine (thermoplastic welding equipment) melts the contact surfaces of plastics, PPR/PVC pipes, and other materials through heating, then joins them under pressure. It is suitable for pipe connections, plastic part welding, and hot riveting.

II. Safety Preparations

- Protective Equipment: Wear heat-resistant gloves, safety goggles, and protective clothing.

 

- Environment: Remove flammable materials; ensure the workspace is well-ventilated, dry, and properly grounded.

 

- Inspection: Verify that the power supply, air supply, molds, emergency stop button, and temperature control are functioning normally.

III. Installation and Commissioning

1. Installing the Molds

 

- Select the appropriate die head/hot mold; ensure it is securely fastened, clean, and free of burrs.

 

- Align the upper and lower dies to ensure concentricity and parallelism to prevent uneven pressure.

 

2. Parameter Settings (Reference)

 

- Temperature: PPR approx. 260°C, PE approx. 220°C, plastic parts 180–250°C.

 

- Heating Time: Approx. 5 seconds for 20mm pipe, approx. 7 seconds for 25mm pipe.

 

- Pressure: Pneumatic 0.2–0.4 MPa (2–4 kgf/cm²).

 

- Holding/Cooling: 10–30 seconds (depending on material and dimensions).

 

3. Machine Testing

 

- Conduct an empty machine test to verify that the up/down movement, emergency stop, and temperature control are functioning normally.

 

- Perform a test fusion using scrap material; inspect the fusion results before proceeding to mass production.

IV. Standard Operating Procedure

1. Workpiece Preparation

 

- Ensure the cut surface is flat, deburred, and clean; mark the insertion depth.

 

2. Heating

 

- Wait until the machine reaches the set temperature (indicator light stabilizes).

 

- Insert the workpiece vertically into the die head up to the marked line; do not rotate and apply even pressure.

 

3. Welding

 

- Once the set time is reached, quickly withdraw the workpiece; within 3 seconds, insert it straight into the mold, ensure it is fully seated, and maintain pressure.

 

- Do not twist or move the workpiece during cooling.

 

4. Quality Inspection

 

- The joint should have a uniform weld bead (double-sided), be free of bubbles, and have no gaps.

V. Shutdown Procedure

1. First, turn off the heating switch and wait for the temperature to drop below 100°C.

 

2. Then turn off the gas supply and power.

 

3. Clean the mold and work surface, and organize the tools.

VI. Safety Precautions

- Do not perform welding until the set temperature is reached.

 

- Never touch hot molds or workpieces with bare hands.

 

- Press both start buttons simultaneously with both hands; do not use a single button.

 

- Do not leave the workstation during operation; press the emergency stop in case of abnormalities.

 

- Before performing maintenance or changing molds, ensure power and gas are disconnected and the machine has cooled down.

VII. Maintenance and Care

- Daily: Clean the mold and heating plate to remove any adhesive residue.

 

- Weekly: Lubricate the guide rails and guide pins.

 

- Monthly: Inspect the power cord, heating elements, cylinders, and seals.

 

- Annually: Calibrate the entire machine and replace wear-prone parts.

VIII. Common Faults and Troubleshooting

- Temperature does not rise: Damaged heating elements, malfunctioning thermostat, loose wiring.

 

- Poor bond: Insufficient temperature, time, or pressure; contaminated workpieces; inadequate cooling.

 

- Over-welding/burning: Excessive temperature, excessive time.

 

- Abnormal operation: Insufficient air pressure, air cylinder leak, solenoid valve failure. Check if the stop button has been reset.